San Diego
Specialty Lighting

Projects

A ballpark, a civic campus, and a bridge over the bay.

Active contracts with Major League Baseball and the City of San Diego, plus two decades of landmark work led by our principals. Most of these are places you've already looked at without knowing someone had to address every luminaire on them.

Active

Two live contracts.

Sports venue  ·  Prevailing wage

Petco Park

Owner
Padres, L.P. — owner of Petco Park
Scope
RGBW luminaire replacement across the upper deck canopy and sports light positions
Luminaires
26 Reach Elite High Output and up to 81 High Punch in; 130 Compact Reach out
Controls
Data Enabler Pro gen3 infrastructure and data intercept
Conditions
Prevailing wage, sequenced around an active game schedule
Term
Mobilized April 2026; extended through August 2026
Status
In progress

Read the full case study →

Reach Elite luminaires lit red on the Petco Park upper structure at night, downtown San Diego beyond
Reach Elite luminaires in service — upper deck

Municipal  ·  Public venue

Civic Plaza

Client
City of San Diego, through San Diego Theatres
Scope
LED retrofit and RGBW integration across the Civic Plaza campus
Objective
Upgrade existing infrastructure to energy-efficient LED with dynamic color for public space illumination
Type
LED retrofit · RGBW integration · municipal public venue
Conditions
Prevailing wage, NEC and City of San Diego code compliant
Status
Active engagement
Civic Plaza walkways and arcade lit blue and violet at night
Plaza luminaires in service — Civic Plaza

Principal experience

Work led by our principals before SDSL.

SDSL is a young company built on two long careers. The projects below were directed or delivered by our CEO and CCO in prior roles — Brendan founding and running an architectural dynamic lighting division on the contracting side, April running crews as a foreman. We list them as principal experience rather than company past performance, because that distinction matters on a bid.

Infrastructure  ·  2018–2020

San Diego–Coronado Bay Bridge

San Diego Unified Port District engineering lighting study, Phases I and II. Overwater work at Piers 16, 17 and 18, with engineered suspension systems, project management and commissioning, coordinated between the Port District and CalTrans.

Hospitality  ·  2020

Hilton San Diego Bayfront

Lobby wall illumination — turnkey delivery of more than 10,000 individually addressable RGB nodes, engineered and installed as a single feature surface.

Division build  ·  2018–2022

A specialty division from zero

Our CEO founded and ran an architectural dynamic lighting division on the contracting side, building it from zero into a profitable first year and delivering turnkey work from site visit through commissioning across the San Diego market.

Commercial  ·  Charlotte, NC

50-story LED sign

High-rise LED signage at a scale where the install method matters as much as the fixture. Out-of-market work taken on for the specialty scope, not the geography.

Hospitality

Hotel del Coronado

Specialty lighting on a National Historic Landmark, where the mounting details matter as much as the light and nothing may be permanently modified.

Hospitality  ·  Controls

Mister A's, Bankers Hill

Interior and terrace lighting for a dining room with one of the best views in the city, on a controller that moves the room through the evening on a schedule rather than a switch.

In the field

One wall, from structure to showtime.

The Hilton San Diego Bayfront lobby wall — more than 10,000 individually addressable RGB nodes delivered by our principals, from bare mounting grid through commissioning.

Bare mounting structure and node grid of the Hilton San Diego Bayfront lobby wall before illumination
Structure and node grid, before power
RGB nodes lit in test patterns during installation of the Hilton San Diego Bayfront lobby wall
Installation underway — nodes under test
Color-changing lobby feature wall at the Hilton San Diego Bayfront in red, magenta and blue
The finished wall in operation

What these have in common

Hard mounting, hard access, hard schedules.

Venue and landmark lighting is rarely a catalog install. The luminaire the designer chose was not made for that canopy, the access window falls between home stands, and the structure is either historic, occupied, over water, or all three.

  • Custom bracket and mounting fabrication
  • Non-destructive attachment on historic structures
  • Work sequenced around active MLB and event schedules
  • Lift, boom, and high-reach installation
  • Coastal and marine-air corrosion detailing
  • Coordination with venue operations and public agencies

Next step

Have a venue that should be doing more at night?